A downloadable game

EdenSpark Game Link

https://games.edenspark.io/post/fPkAFRnKJ4jC1zR5/

Transform and survive for as long as possible. Switch between mech and jet forms at insane speeds and perform near-miss dodges to trigger slow motion.

Controls

Keyboard

Jet FormW or SpaceUp arrow
Mecha FormSDown arrow
Move LeftALeft arrow
Move RightDRight arrow

Controller: Left Stick 


Updated 6 days ago
Published 7 days ago
StatusReleased
Authormaxeg
GenrePlatformer
Tagsedenspark, mecha
AI DisclosureAI Assisted, Code, Graphics

Download

Download
turboMechaRush.zip 222 MB

Leave a comment

Log in with itch.io to leave a comment.